In my multistrata robust model I want to constrain Psi by time or time related covariates.  My question is on setting up the mlogit in the parameter specific links.  I have three states and thus 6 Psi and 14 time periods.  When time is not in the model I set it up as L to M and L to P Mlogit (1), M to L and M to P as Mlogit (2), and P to L and P to M as Mlogit (3).   For the model under time constraints would I set each Psi pair to the same Mlogit for each time period, e.g. L to P and L to M Mlogit (1) for time 1, Mlogit (2) for time two etc?  
I also have three transitions that are set to 0 in the fixed parameters because they cannot occur, M to L, M to P and P to L.  I was thinking for the M Psis I could leave out the time dependence in the PIMs and then use the same tier Mlogit link for both.  Although, P to L cannot occur P to M can (although with low frequency).  Do I need to set up time dependence for both Ps in the PIMs so I can set the Mlogits or is it possible to not set up time dependence for P to L?  If that is possible, what would I set the Mloigt to for the single P to L relative to the time dependant P to M Psis?
Thanks,
Nicole